Hybrid Commercial Solution

Client
Kamal Fabrics

Location
Fasialabad

Installed Power
695 KW


Kamal Fabrics, one of the leading textile producers in Pakistan, approached Nizam Energy to resolve the issues they were facing as a result of unplanned electricity outage. In the event of load-shedding, the delay in generators providing power backup would spoil entire batches of fabric being spun on the machines.

The Solar System deployed by Nizam Energy includes an Off Gird-Hybrid System providing 0.65 MW PV Power (extendable up to 1 MW) through 2600 solar panels. These panels are connected to industrial-level UPS, providing 20 minutes backup time in case electricity goes out. The UPS in-turn are synchronized with the generators allowing a smooth, undisturbed switchover during power outages.


View More Projects